Premier Abbasi inaugurates second LNG terminal at Port Qasim

F.P. Report

KARACHI: Prime Minister Shahid Khaqan Abbasi has said that when Pakistan Muslim League-Nawaz (PML-N) took control of the government there was severe shortage of power in the country but now we are struggling to provide not stop electricity in all across the country to the masses.

This he said while inaugurating the second LNG terminal at Port Qasim, built at a cost of Rs50 billion on Monday.

PM Abbasi added that we have taken several steps to control the shortage of energy in the country and we are succeeded in it with some extent because of our policies and now the load shedding duration was much less comparing to the last government tenure.

The premier said that he is hopeful more LNG terminals will be working in the country.